"Provision of bars of any kind of profile for manufacturing steel shoring; provision, loading, moving to the work site, unloading, storage, maintenance and taking from the storage area of accessories and other necessaiy materials and equipment of steel shoring; manufacturing of steel shoring and its accessories (shoring tie rods, nuts, ground-shoring connections for the assembled shoring pieces) in transportable pieces, transportation of steel shoring to the assembly site, erection of scaffolds necessaiy for the assembly of the steel shoring, assembly and supporting the steel shoring with all its connections according to security provisions at any depth, height and width in any place, connection of a necessaiy number of steel shoring assembled at certain intervals; provision, installation, and operation of lighting, ventilation, grounding, warning, drainage and any other necessaiy systems to ensure the precise and safe controls of shoring works and assembly; all kinds of costs such as labour, materials (including losses), equipment, heavy machinery, energy, water, and so on, site mobilization, work challenges, underperformance, along with contractor profits and overhead costs, insurance, and overhead costs..."
off şimdi bisiklet turunda olmak vardı
